We produce the fixed and the loose side of a hotel together - cladding, flooring, millwork, doors, railings, sanitary ware, aluminium framing, woodwork and FF&E, plus the hotel supplies that furnish the finished room - so parts made in separate workshops still meet on site.
We develop the tooling, machine the parts, and hold the first article against the drawing before a tool goes into full production.
We move a concept through material selection, a manufacturability review and sample rounds until one sample is sealed. Everything after that is measured against it.
We move a fabric spec from swatch to cut goods - weight, weave, colour and finish held to the approved reference, and the same reference used again on the repeat order.
We fit the carton to the bottle that actually came out of the tool, then check decoration and tolerance on every batch rather than on the first one.
We take a carton from dieline to folded, printed stock, and check the finish against the approved sample before the run ships.
Projects that span several of these at once - a hotel needing millwork, glazing and cosmetics packaging in one order, say - run under one schedule and one shipment, not six separate ones.
The four stages are the same in every industry - Align, Execute, Validate, Deliver. What gets measured inside them, and what breaks when nobody measures it, is not. Dozens of projects and hundreds of shipments have run through them.
We verify, we don't certify - the standards below belong to the certified plants that make the goods, and requirements vary by destination market, so confirm the ones that apply to yours before an order moves.
A drawing still has to survive a supplier choice, a plant, a sample round and a site. Our process covers that distance - technical review, sampling, supplier contracts, time on the floor, and the fit check at the end.
Where each one sits, what it makes, and how far it is from our Foshan office is laid out on the About page.
The full network →Tell us the scope. We will come back with how many suppliers it takes, in what order they run, and which decisions have to be closed first.
Start a project How ready am I? Next - how a project runs →